Nan’an Manufacturing Base

See Where the Valve Order Becomes Physical

Machining, assembly, pressure testing, inspection and packing are coordinated at the Nan’an base, with the Dongguan team keeping overseas buyers informed.

Factory Record

Real photographs, not a generic factory tour.

These images show the current workshop, finished-valve inventory and test area used in day-to-day production. As more dated production records are prepared, this page can be expanded by process and product family.

Production Route

The work behind a finished valve

The exact route changes by valve type, material and order. The checkpoints below are the practical basis used to plan production and inspection.

01 · COMPONENTS

Material and component preparation

Castings, purchased parts and order-specific materials are checked against the approved configuration before they move forward.

02 · MACHINING

Machining and dimensional checks

Critical sealing, flange and connection dimensions are checked during machining rather than left to final inspection.

03 · ASSEMBLY & TEST

Assembly and pressure testing

Valve assembly is followed by the hydrostatic or seat-leakage test required for the agreed product and project basis.

04 · RELEASE

Marking, documentation and packing

Nameplates, coating, packing marks and shipment documents are reviewed before the batch is released.

Production team at the Nan'an manufacturing base
Why Nan’an

A manufacturing base inside a mature valve supply chain

Nan’an has a concentrated valve manufacturing ecosystem. Access to components, machining, surface-treatment support, packaging and experienced labour helps the team coordinate schedules quickly and control total sourcing cost.

Faster coordination does not mean skipping technical confirmation. Lead time is quoted against the actual specification, quantity and production load.
Competitive pricing is built from the production route and local supply chain, not from substituting unapproved materials or standards.
Inspection and Visit Requests

Define the inspection points before production starts.

Share your inspection plan, witness requirements or third-party inspection request with the RFQ. Factory visit arrangements can be discussed for confirmed projects.