What Information Should Be Included in a Valve RFQ?
A supplier can quote from an incomplete schedule, but every blank field becomes an assumption. This checklist helps you decide which blanks are harmless and which ones can change the valve.
At minimum, identify the valve duty, nominal size, pressure basis, end connection, body material, operating medium, temperature, actuation, quantity and destination. Attach the governing specification or existing-valve photo when available.
The ten fields that usually decide the quotation
What to send when the schedule is incomplete
A nameplate photograph, face-to-face dimension, connection photograph and a picture of the installation often answer more questions than a guessed model number. Mark every unknown field as “to be confirmed” rather than copying a value from a similar valve.
Commercial details belong beside the technical ones
State the required Incoterm, destination, target timing, packing requirement, inspection responsibility and quotation currency. If the order is for resale, say whether neutral packing or private-label marks are needed.
A short RFQ example
Before you send
- Give every attachment a project or schedule reference.
- Keep units visible in every spreadsheet column.
- Separate mandatory requirements from acceptable alternatives.
- Ask the supplier to list assumptions in the offer.